To the central content area

Water Pollution Auditing and Control Project for Each River Tributary within Taoyuan County in 2009

Absrtact
The Environmental Protection Bureau of Taoyuan County Government (abbreviated as the Environmental Protection Bureau) would, in consideration of ever increasing countless enlisted enterprises within the county and limited auditing manpower of the Environmental Protection Bureau, like to make use of this project to carry out information auditing work for all of the enlisted water pollution sources within the country in stages through this project (including PC board manufacturing industry, husbandry industry (1), and water drainage). In addition, it would, on one hand, continue to focus on patrol and water quality control of rain-water ditch from specialized sewage system in each of the industry parks, but also pinpoint on contingent project for pollutant of this county for review and improvement so as to cope with facilitation of related work to the prevention and evaluation project on marine pollutant from Environment Protection Administration (EPA) in 2010 This project will start from 18th October of 2009 to 17th July of 2010, and the progress and implementation results from each item of works are found as follows: First of all, it will conduct 480 times of point inspection and surveillance at rain-water ditch of the designated industry park, and a total of 18 unqualified checks are obtained, with its entire pass rate reaching from 93.5% in 2008 to that of 96.3% in 2009; as for rain-water ditch of industry park with lower pass rate, it includes RD01~RD03 3rd Industry Zone of Linkow Industry Park and RD05~6 to Da-yuan Industry Park. On the other hand, it is found with a case of abnormal water quality at rain-water ditch, and a fine of NT$270,000 was awarded, with achievement rate of follow-up reaching 50%. As for occurrence frequency of abnormal water quality, the rate of unqualified check during off-hour is 5.5%, which is relatively higher than 3.8% during that of office hour. For the part of site auditing operation of focused industry within the county, among those 124 establishments of water drainage business it is found that respective 28 establishments for each of the administration unit and unlabeled pipeline as well as the discrepancy of waste-water flow-chart against permit are reckoned to be the greatest, seconded by 13 establishments of discrepancy of waste-water flow-chart against permit, trailed by 9 establishments that have not kept proper record of power and water consumption or in excess of authorized amount, while there are 7 establishments that are classified as of tributary sign-post and suspicious of release with detoured pipeline or secret pipeline that does not standard. Furthermore, there are 14 establishments which are fined because of legal provisions or the audited results found in discrepancy to the authorized items of permit, and a total of fine money as 1,280,000 is award. Also, 4 establishments have put forth application for permit modification. As for those 30 establishments of husbandry industry (1) audited, there are respectively 7 and 9 establishments that are found with violation of administration unit and unlabeled pipeline, and there are another 27 establishments which are found with lesser or excessive amount or with none of SV30 tested amount of waste soil. For those 30 establishments of PC board manufacturing industry audited, there are respectively 3 and 4 that found of violation for administration unit and unlabeled pipeline, and second by 1 establishment of suspicious detoured pipeline. For the part o f screening work among designated documents, there are in total of 1674 establishments whose written and network fixed-period declaration due for January of 2010 have all been completed, with 100% of declaration rate. As for random screening, 1674 cases are completed, and thus the total screening rate has also achieved 100%. As for second-stage of the newly-established gas station, it has assisted 6 cases of gas station application, and all of them are system renewal case with underground oil-tank; three of the cases are first-stage application, the rest three are second-stage application and they have been approved after making up with supplementary documents. As for online review of existing gas stations, the declaration rate and screening rate for gas station in third and fourth quarter of 2009, and first quarter in 2010 have all reached 100%; besides, there are in total of 2,475 cases (1380 establishments) being conducted assisting Environmental Protection Bureau implementing the construction of water pollution resource information management system for filing application information on the establishment of water pollution prevention measure plan and water (polluted) water emission surface water body. As for the part of modification regarding information anomaly of water supply system by EPA, modification of information anomaly for 1485 establishments (3908 lots) for second time in 2009 are completed, and 419 lots of modification of information anomaly for first time in 2010 are also done. In view of the work for review and repair regarding power supply of anti-washing facilities of inter-gravel contact oxidation sink at the engineering zone of water purification under river bridge of Nan-kang tributary of the country, it is completed of transfer and installation for Taiwan Power Company (TPC) power meter and change application of user name, and so as the trial operation. For part of review and programming regarding marine pollution work of the county, it has completed setting forward review and proposed related suggestions of draft (seen in chapter 6), and has assisted sponsoring the establishment and preparatory meeting on “Protection Facilitation Team of Marine Environment in Taoyuan County.” Besides, it has, in coping with EPA in view of pollution dredging and supervision of Nan-kang Stream and Lao-je Stream of the country, coordination work, and information organization for submission and related matters, not only worked in 4 meetings to provide or analyze or explain 20 copies of information, but also helped compiling report production and presentation on river pollution dredging evaluation result for the three focused streams as Da-han Stream, Nan-kang Stream, and Lao-je Stream. As for assistance rendered to the related document operation for compiling river pollution dredging and marine pollution prevention and evaluation project, they have been done within deadline, and reports as “Report on Marine Pollution Prevention and Evaluation Results in 2009,” “Accomplishment Report on River Pollution Prevention and Evaluation in 2009,” “Prospect and Evaluation Plan on River Pollution Dredging in 2010” and so as the production of presentation. Furthermore, the project has begun its implementation from 18th October of 2009 until today, running through year 2009 and 2010, and some of the work items that assist Environmental Protection Bureau to strive for auditing and evaluation score from EPA for river pollution dredging evaluation project can have helped to obtain score of 5.06 in 2009 and 9.94 in 2010.
Keyword
detoured pipeline;fixed-period declaration;rain-water ditch
Open
top